Pen drawing of East Lodge |
The start of April is our target date and the new East and West lodges are progressing well, despite the setbacks with torrential rain.
|
Kitchens also have dishwashers as standard |
|
Still a bit of finishing to do, but the kitchen is fitted |
We managed to get the electricity connected in mid December so the underfloor heated got its first test and everything works beautifully. Some of the workmen realised they could dry out wet clothing by laying it on the floor!
|
Luxury bathroom with underfloor heating and spa shower |
Once everything was checked the floors could be finished and it was on with fitting the bathrooms and kitchens - these are the same in both lodges and have luxury fitments. The kitchens include dishwashers and the bathrooms luxury spa showers.
Interiors are again being discussed and the current favourite is a stripe or check by
Ian Mankin interiors. although we love the name of the Arran Charcoal, it's a little dark for our interiors.
Outside the block paving has started and quickly transforms the path from a building site to a finished product. The landscaping is next for the shared front and the enclosed rear gardens. We have not decided yet whether to turf or flag - or combine both.
|
Ensuring the outside will be as good as the inside with solid black pavement |
We are definitely on target and should be putting the furniture and soft furnishings in by the end of February.